ATRIUM
LINK EXTENSION
Environmental
Impact Assessment
ENVIRONMENTAL
MONITORING AND AUDIT MANUAL
TABLE OF
CONTENTS
Background of the Project
Project Scope
Construction Programme
Purpose of the Manual
Project Organisation
Introduction
Methodology and Criteria
Monitoring Equipment
Construction Phase
Operational Phase
Monitoring Locations
Baseline Monitoring
Impact Monitoring
Compliance Assessment
Event and Action Plan
Mitigation Measures
Introduction
Construction Phase
Operational Phase
Introduction
Cooling Water Intake Monitoring
Schedule and Stations
Field Log
Monitoring Equipment
Laboratory Measurement / Analysis
Event and Action Plan
Mitigation of Adverse
Environmental Impacts
Introduction
Mitigation Measures
Good Site Practices
Waste Reduction Measures
General Refuse
Construction and Demolition
Material
Chemical Waste
Introduction
Monitoring Requirement
Mitigation Measures
Site Inspections
Compliance with Legal and
Contractual Requirements
Environmental Complaints
General
Electronic Reporting of EM&A
Information
Baseline Monitoring Report
Monthly EM&A Reports
First Monthly EM&A Report
Subsequent EM&A Reports
Quarterly EM&A Summary Reports
Final EM&A Review Reports
Data Keeping
Interim Notifications of
Environmental Quality Limit Exceedances
List of
Tables
Table 1.1....... Tentative
Programme for Atrium Link Extension Works
Table 2.1....... Air
Quality Monitoring Station
Table 2.2....... Impact
Monitoring Programme (TSP)
Table 2.3....... Proposed
Action and Limit Levels for Impact Monitoring
Table 2.5....... Event
/ Action Plan for Air Quality (Operational Phase)
Table 2.4....... Event
/ Action Plan for Air Quality (Construction Phase)
Table 4.1....... Proposed
Marine Water Quality Stations for Baseline and Construction Phase Monitoring
Table 4.2....... Proposed
Marine Water Quality Monitoring Frequency and Parameters
Table 4.3....... Analytical
Methods to be applied to Marine Water Quality Samples
Table 4.4....... Action
and Limit Levels for Marine Water Quality at the Cooling Water Intakes
Table 4.5....... Event
and Action Plan for Marine Water Quality
List of
Figures
Figure 1.1 Location of Proposed Atrium Link Extension
Figure 1.2 Longitudinal Section of Proposed Atrium Link
Extension
Figure 1.3 Project Organisation
Figure 2.1 Location of Air Quality Monitoring Station
Figure 4.1 Locations of Water Quality Monitoring Stations
Figure 7.1 Complaint Response Procedures
Appendices
Appendix
B Implementation Schedule of
Proposed Mitigation Measures
Appendix C Sample Template for the Interim
Notification